News

Two more days, and then clear winter days like today will bring about an optimum power harvest

Only 2 more days until the connection to the power system

The onset of winter caused only a short construction delay.

The simulation results for the complete system show that the greenhouse gas CO2 emission will be reduced by approx. 42 long tons per year (92.21 lbs/p.a.).

By this we actively contribute to the climate protection of the Berlin environment.

 

The PV system on the left side aisle shortly before its completion

Climate protection: think globally – act locally 

Our special bank account for the energetic restoration:

Bank: DKB Deutsche Kreditbank AG, Bank code: 120 300 00,
Account Number: 100 500 6000,

Reason for transfer: energetic renovation

An awesome mirror image of the PV system
Part of the PV system that already has been connected to the power inverter (right side aisle)